Foxhole's farmhouse during renovation work

Find out more about the suppliers who worked on this project

The underfloor heating was provided by Edwards Contractors

Base Architecture and Design worked on the planning amendments and dealing with conservation

The lime mortar, plaster, wood and fibre insulation was provided by Lime Green Products ltd

The bronze windows were from Bronze Casements

All the building work was provided by David Howell Building &

Property Maintenance

Architectural steel fabrication and design was provided by Walker Engineering

The traditional bathroom suites were provided by The Cast Iron Bath Company

The quality oak was supplied by Border Hardwood

Broughtons of Leicester provided the specialist door furniture

Olivers were the lighting consultants and suppliers

Details correct at time of original broadcast January 2015