Find out more about the suppliers used in the Pannal Water Tower restoration.

The insulation of the walls and floors was by Kingspan Insulation Ltd

kingspaninsulation.co.uk

Yorkshire Stoves supplied and installed the stove in the tank room

yorkshirestoves.co.uk

The bathroom fittings were from Victoria Plumb Bathrooms

victoriaplumb.com

The main building work contractor was John M Sykes and Sons Ltd

sykesbuild.com

Manor Coating Systems supplied the pain for the exterior of the tank

manorcoatingsystems.co.uk

The bathroom tiles were from N&C Tile Style

nichollsandclarke.com

The sewage treatment plant was supplied by Klargester

klargester.com

The bi-fold doors were from Express Bi-Fold Doors

expressbifolds.co.uk

DecSpray spray painted the tank exterior

decspray.co.uk

The exterior scaffolding was by Trui-fix Scaffolding

tru-fixscaffolding.co.uk

The felling of woodland trees was completed by Treeworld Tree Surgeons

treeworld.uk.com

The underfloor heating was provided by Polypipe Building Products

polypipe.com

The large rug in the water tank was from The Rug House

therughouse.co.uk

Details correct at time of original broadcast, January 2015