If you took a shine to something you saw in the episode, find the 'who, what and where?' of Jon and Becky's build here

Appliances

The kitchen appliances were supplied by Neff.

www.neff.co.uk

Architect

The architects that took on the project revisions and saw it through to completion were Simmons Building Design.

www.sbd-wells.co.uk

Bricks

The bricks for the building were supplied by IBSTOCK.

www.ibstock.com

Builders merchants

The builders merchants that supplied many materials for the project was Travis Perkins.

www.travisperkins.co.uk

Carpets

The carpets throughout the property were supplied and fitted by Market Carpets Ltd.

www.marketcarpets.co.uk

Cement

The cement for the build was provided by Lafarge Cement UK.

www.lafarge.co.uk

Concrete

The concrete for the build was supplied by S. Morris Ltd.

www.smorris.co.uk

Corian worktops

The white Corian worktops in the kitchen were supplied by C.JEM Worksurfaces.

www.cjemworksurfaces.com

Fireplace

The fire in the living room was from Stovax Ltd.

www.stovax.com

Glass balustrades

The glass balustrades for the staircase and exterior decking was supplied by Glassworks of Taunton.

www.glassworkstaunton.co.uk

Insulation

The insulation material used in the building was from Celotex.

www.celotex.co.uk

Kitchen

The kitchen was supplied by Travis Perkins.

http://www.travisperkins.co.uk/

Lift

The lift was supplied and installed by Axess 2 Ltd.

www.axess2.co.uk

Mechanical Ventilation Heat Recovery and Ground Source Heat Pump

The MVHR and Ground Source Heat Pump systems were installed by Barkwell Plumbing & Heating.

www.bjbarkwell.co.uk

Project manager

The project was managed by Jon himself, as The White House Future.

www.thewhitehousefuture.co.uk

Retaining walls

The polystyrene and steel mesh blocks that formed the basement retaining wall were supplied by Polysteel.

www.polysteel.co.uk

Solar panels

The solar panels on the roof were supplied by RES (Devon) Ltd.

www.res-devon.co.uk

Staircase and bookcase joinery

The staircase and adjoining bookcase were made by Cottrell Joinery.

cottrelljoinery.com

Steel frame

The steel frame for the building was supplied by Underhill Building Services Ltd.

www.underhillengineering.co.uk

Steelwork

The steelwork added to the steel frame to accommodate the rear windows, plus the wind post at the corner of the conservatory was provided by Luffman Engineering Ltd.

www.luffman.co.uk

Tanking

The Dual Seal membrane for the building was supplied by SCP Concrete Sealing Technology Ltd.

www.ameyroadways.co.uk

Tarmac

The tarmac for the driveway was provided by Amey Roadways Ltd.

www.ameyroadways.co.uk

Tiles

The tiles throughout the building were supplied by Tile Giant.

www.tilegiant.co.uk

Tiling

The tiling work throughout the building was provided by Rogers Tiling.

07748 128882

Timber frame

The timber frame for the building was provided by Space4 Ltd.

www.space4.co.uk

Windows

All the glazing apart from the roof windows were supplied and fitted by P.S. Counter Windows Ltd

www.pscounterwindows.co.uk

All the roof windows upstairs were supplied by Velux.

www.velux.co.uk

Wooden flooring

The wooden flooring in the main living spaces were supplied by Kährs UK Ltd.

www.kahrs.com/en-GB/Retailers/