Colin and Marta constructed and decorated their house using the following products and services...

Architects

The project was conceived and designed by Richard Murphy Architects

www.richardmurphyarchitects.com

Boiler

The wood pellet boiler was supplied and fitted by Glendevon Energy

www.glendevonenergy.co.uk

Cladding

The corrugated aluminium cladding and flashings on the roof and walls were fitted by Curtis Moore

www.curtismoore.co.uk

Engineers

Create Engineering carried out all the structural calculations necessary to make sure Colin and Marta met both building regulations and their need for being braced for winds in excess of 100mph

www.createengineering.com

Furniture

All the furniture throughout the house was supplied by Barker and Stonehouse

www.barkerandstonehouse.co.uk/

Groundworks

The main groundworks and drainage were carried out by Tusk Plant & Civil Engineering

www.tuskplant.com

Kitchen

The Jackton Moor kitchen was manufactured, supplied and fitted by TMS Direct

www.tmsdirect.co.uk/

Metsec framework

The MetSec framing was installed by CM Framing and Partitions

Mirrors

The mirrors in the downstairs bedrooms and kitchen were supplied and fitted by Forsyth Glazing

www.forsythglazing.co.uk

Office and studio desktops

The 17 metres of solid wood worktops in the home office and attic studio were supplied by Worktop Express

www.worktop-express.co.uk/

Steel

The main steel frame of the house was fabricated and erected by GR Contracts

www.grcontracts.co.uk

Windows

The curtain wall glazing with Schuko frames were supplied and fitted by Northern Tectonics

www.northerntectonics.co.uk

Underfloor heating and MVHR

The underfloor heating system and the mechanical ventilation and heat recovery system were supplied and fitted by Thermsaver

www.thermsaver.co.uk