Michael and Phil used the following suppliers to create their rural idyll

Architect

The architect for this project was Sara Guardhouse of TAATE.

http://www.taate.net

Artwork

Large black and red artwork in the living room by Terry Frost.

http://www.dacs.org.uk

Red and white artwork in the bedroom was by Rob Ryan.

http://robryanstudio.com/

Bathroom fittings

The bathroom fittings were supplied by UK Bathroom Warehouse.

http://www.ukbathroomwarehouse.com/

Decorations

The painting and decorating works were completed by S.J.R Decorators Ltd.

01264 792969

Electrical works

The electrical works throughout the building were provided by P.A.D. Electrics.

http://www.padelectrics.co.uk/

Fireplace

The steel fireplace in the main living space was supplied by Smith Whinney Blacksmiths.

http://www.smithwhinney.co.uk

Flooring

The polished concrete floors throughout the building were completed by Lazenby.

http://www.lazenby.co.uk/

Glazing

The large sliding glass window and circular roof light were supplied by Cantifix.

http://www.cantifix.co.uk/

The rest of the glazing in the building, including the bi-folding doors in the kitchen were supplied by Aluminium Manufacturing Ltd.

http://www.aluminiummanufacturing.co.uk/

Green roof

The wildflower meadow roof above the guest room was supplied by Wildflower Turf Ltd.

http://www.wildflowerturf.co.uk/

Ground source heat pump

The ground source heat pump system was supplied by Nu-Heat.

http://www.nu-heat.co.uk

Ground works + waterproofing

The ground works and the waterproofing of the basement slab was completed by JGB Groundwork Ltd.

http://www.jgbgroundwork.co.uk/

Lighting

The ceiling lighting system was provided by Cirrus Lighting.

http://www.cirruslighting.co.uk/

Lintel

The lintel above the fireplace started out as a fallen log from one of Phil and Michael’s Oak trees and was transformed by Craig Narramore.

http://www.craignarramore.com

Main contractor

The main contractors that took on this project were Greenham Construction.

http://www.greenhamconstruction.com

Plastering and rendering

The plastering and rendering works throughout the building were provided by Dale Bird of RNB Plastering.

07979801481

Plumbing works

The plumbing works throughout the building were provided by Hampstead Heating.

http://hampsteadheating.co.uk/

Pond

The steel pond structure was supplied by Smith Whinney Blacksmiths.

http://www.smithwhinney.co.uk

Roof

The rubber roof membrane that also covered the rear of the building was supplied and fitted by AAC Waterproofing Ltd.

http://www.aac-prelasti.co.uk/

Staircase

The steel staircase leading up to the main living space in the building was supplied by Smith Whinney Blacksmiths.

http://www.smithwhinney.co.uk

Steel frame

The steel frame for the building was supplied by Alpine Group.

http://www.alpinegroupuk.com/

Stone table

The stone table in the garden outside the kitchen was supplied by Garden Art Plus Ltd.

http://www.gardenartplus.com/

Structural engineer

The structural engineers on this project were CBE Ltd.

http://www.cbsengineering.co.uk

Tadelakt works

The Tadelakt applied to all the wet room walls was provided by Decoplast.

http://www.decoplast.com/

Trees

The new trees planted on the property were supplied by Majestic Trees.

http://www.magestictrees.co.uk