Kevin with Peter and Chard

Find out more about the suppliers that featured in Peter and Chard's modern-day roundhouse.

The Build

The architect was Andrew Armes

The air-tightness test was run by London Insulation Ltd

The boarding and plastering work was completed by David Brealey

Tel: 01933316803

The carpentry was completed by Marc Davies

The cladding was from Bennetts Timber

The concrete floor polishing was completed by Carr Restoration Ltd.

The electrics were completed by GT Electrical Services

Tel: 07703561694

The painting was completed by Peter Robinson

Tel: 077023500086

The tiling was by Luke Tacker

Tel: 07702797106

The foundations and groundworks were completed by Advanced Foundation Technology

The ground and environmental services were completed by Trendrevel Services Ltd

The insulation was Thermafleece EcoRoll from Passivhaus Store

The plumbing was by Wesley Plumbing and Heating Ltd

The roofing was completed by DF Roofing Ltd

Outside Peter and Chard's home

The wildflower roof was from Opti Green

The solar panels were from SolarTech Ltd

The timber frame team were Touchwood Homes

The ventilation was provided by Aeroco Ventilation Ltd

The windows and external doors were from Venturi UK Ltd.


The kitchen was from Magnet Kitchens

The fish tank was from Hobbyfish

The internal doors were from Howdens Joinery Co.

The light switches were from Sensorbility