Skip Channel4 main Navigation

|Powered By Google


4Homes
The Medway Eco-barge
barge
page 1 2 3 4 5 6

Project

Chris Miller and his wife Sze Liu Lai lived in a tiny flat in East London with their two children Alexion and Tayszea. It was very tight for space and as the kids grew they really felt in need of more room. Chris and Sze are both social workers on low incomes and they have very little in the way of savings.




They did however own a small narrow boat, which inspired a solution to their ‘no money, no space’ dilemma.

They decided to build a houseboat which would give them more space for a fraction of the price of a home on land. They began with an 86ft steel barge moored in a boatyard on the River Medway.

empty barge

Chris and Sze were totally committed to adopting an eco friendly lifestyle and due to their lack of funds, came up with a very radical approach - using nothing but reclaimed materials.

With no design and no drawings, they began with only a mental image of what they wanted. Their first idea was to build a superstructure from whatever materials they could find. They wanted a tower to provide them with a raised entrance lobby, keeping the lower decks private and providing an excellent place to mount a wind generator.

The arrangement inside was still anyone’s guess. From the tower, a spiral staircase - if they could find one - would lead down through the boat to the two decks below. In the hull, three bedrooms were planned with a family bathroom in which Chris hoped to put a composting toilet and recycled water system.

Upstairs was to be one single, long, open plan living room. Every window and door relied on whatever Chris could find second hand. In the kitchen area they planned a wood burning stove to cook on and to provide hot water and heating, but only if they could reclaim one from somewhere.

The whole build was a list of ifs and maybes. The reliance solely on reclaimed materials means you have little control over the design, schedule, or cost. Chris and Sze had just £50,000 to build their houseboat, £20,000 of which was set aside for the eco features. It was a ridiculously tight budget and nobody knew what would happen.

But because it’s a houseboat they could do pretty much what they liked.


stairs Budget
Did the project stick to the planned budget?
outside Image Gallery
Get the bigger picture and full detail of the build
barge Video Walkthrough
Take a tour round the completed barge
barge Kevin's View
This project utilised a process called chance...
interior Services & Suppliers
Like what you've seen? Check here for suppliers used
kevin on boat Trade Secrets Delve deeper into the inspiration behind the project

Page 2: How much did it all cost? >>

page 1 2 3 4 5 6

4Homes